La Higuerita Project is located on the Northern end of the El Colomo Mining District.
Previous Work has identified possible Bulk-Tonnage Resource Potential at La Higuerita.
The average grade of the surface of an exposure of mineralized felsic intrusion at La Higuerita was calculated by previous owner Golden Anvil using the kriging method on results from 69 trench and surface samples representing an area 1000 m long X 80 m wide as follows*:
This mineralized zone is open at depth and along strike.
The sampling, data management and grade calculation were not designed nor supervised by a Qualified Person and are not NI 43-101 compliant. The calculation should not be relied upon but is discussed here to illustrate the geologic potential for bulk-tonnage targets on the property.
Masivo Gold & Silver
Copyright © 2021 Masivo Gold & Silver - All rights reserved